Productivity Analysis Of Supply Chain Management Performance On Building Construction For Time Efficiency (Case Study Of RSHS Bandung Project)

Authors

  • Andra Andriansyah Universitas Swadaya Gunungjati
  • Nendang Saputra Universitas Swadaya Gunung Jati
  • Muhammad Zakaria Anamy Universitas Swadaya Gunung Jati
  • Nikko Rozy Universitas Swadaya Gunung Jati

DOI:

https://doi.org/10.59261/jequi.v7i1.216

Keywords:

Management Construction, Time Schedule

Abstract

This research can be a reference for other project management who want to implement supply chain management. Supply chain management is one of the important things in a construction project where the application of supply chain management will affect the success of a construction project both material management, type of work, and time schedule. Therefore, this study aims to reduce the risk of time losses and the effect of productivity performance on a project. By using a quantitative method that reviews the s-curve and distributes questionnaires, this study shows that the total deviation is 171.62 which results in an average deviation of 3.502 per week. Stating that the deviation results in a deviation of sure + and after conducting validity, reliability and satisfaction tests, the results show that supply chain management can accelerate and streamline time on building construction projects.

Downloads

Download data is not yet available.

References

Fadhlurrahman, M., Widiasanti, I., Septiandini, E., Studi Teknologi Rekayasa Konstruksi Bangunan Gedung, P., & Negeri Jakarta, U. (2024). Analisis Manajemen Konstruksi pada Pembangunan Gudang PT. PJPT Senopati. Jurnal Pendidikan Tambusai, 8(1), 1405–1411.

Fatimah, A., & Iqbal, M. (2021). ANALISIS POLA DAN KINERJA SUPPLY CHAIN PADA KONSTRUKSI BANGUNAN GEDUNGDI KOTA BANDA ACEH (

Analisis of Supply Chai Patterns And Performance On Building Construcrion in Banda Aceh City ). DENSITY Journal: (Development Engineering of University, 3(2), 36–41. https://journal.umbjm.ac.id/index.php/density/article/view/803

Handayani, M., Jayadilaga, Y., Fitri, A. U., Rachman, D. A., Fajriah Istiqamah, N., Diah, T., Pratiwi, A. P., & Kas, R. (2023). Sosialisasi dan Pengenalan Aplikasi Pengolahan Data SPSS pada Mahasiswa Administrasi Kesehatan Fakultas Ilmu Keolahragaan dan Kesehatan. JIPM : Jurnal Informasi Pengabdian Masyarakat, 1(2), 25–31. https://e-journal.nalanda.ac.id/index.php/jipm

Hermawan, R., & Chalid, A. (2023). Kinerja Supply Chain Management Pada Construction Project (Studi Kasus: Kontraktor Pelaksana Pt. Pilar Teguh Utama Pada Pembangunan Pabrik Sepatu Pt. Adonia Footware Indonesia – Lebaksiu, Tegal. Sistem Infrastruktur Teknik Sipil (SIMTEKS), 3(2), 176. https://doi.org/10.32897/simteks.v3i2.2838

Lie, V., Hudaya, R. G., & Alifen, R. S. (2020). Analisis Faktor-Faktor Yang Mempengaruhi Produktivitas Perusahaan. Jurnal Dimensi Pratama Teknik Sipil, 9(1), 244–251.

Mahapatni, I. A. P. S. (2019). Metode Perencanaan dan Pengendalian Proyek Konstruksi. In UNHI Press.

Oktaviani, C. Z., Sipil, J. T., Teknik, F., & Kuala, U. S. (2019). Upaya peningkatan efektivitas dan efisiensi rantai pasok proyek konstruksi dengan pengukuran kinerja. 8(Desember), 73–79.

Rama Auliansyah, C., Dedy Irawan, J., & Xaverius Ariwibisono, F. (2023). Rancang Bangun Sistem Monitoring Manajemen Proyek Konstruksi Menggunakan Kurva-

S. JATI (Jurnal Mahasiswa Teknik Informatika), 6(2), 1106–1114. https://doi.org/10.36040/jati.v6i2.5324

Sonny, Tiara, Zakia, & Pasaribu, R. (2023). Kegunaan Aplikasi Spss Pada Mahasiswa Manajemen Informatika Pada Mata Kuliah Statistika. Journal of Student Development Information Technology (JoSDIT), 1(1), 30–34.

Tama, A. K., Anggraini, L., & Tutuko, B. (2020). Analisis Kinerja Manajemen Konstruksi Pada Proyek Gedung Digitasi Universitas Negeri Semarang. Jurnal Teknik Sipil, 1–15.

Tanthowi, A. (2021). Implementasi Sistem Informasi Pembayaran Berbasis SMS Gateway. Jurnal Informatika Dan Rekayasa Perangkat Lunak (JATIKA), 2(2), 188–195.

Andi Maddepungeng, Irma Suryani, Nikkoo Rizqi Kasyfurrahman. (2015). ANALISIS KINERJA SUPPLY CHAIN PADA PROYEK KONSTRUKSI BANGUNAN GEDUNG DENGAN TINJAUAN PADA PEKERJAAN STRUKTUR (STUDI KASUS PROYEK APARTEMEN PARAGON JURNAL FONDASI, Volume 4 No 1, (79-87)

Andi Madeppungeng , Rifky Ujianto , Mariana Feronica Damanik. (2019).

PENGARUH SUPPLY CHAIN MANAGEMENT (SCM) TERHADAP DAYA SAING DAN KINERJA PROYEK PADA KONSTRUKSI GEDUNG

BERTINGKAT TINGGI (Studi Kasus : Proyek Konstruksi Gedung Bertingkat Tinggi di DKI Jakarta dan Tangerang ) Jurnal Fondasi, Volume 8 No 1 (1-11)

Andi Maddepungeng, Irma Suryani, Rohaesih Yuliatin. Analisis Kinerja Supply Chain Pada Proyek Konstruksi Bangunan Gedung

Demi Ramadian, Elita Amrina. (2019) . Sistem Pengukuran Kinerja Supply Chain Management pada Proyek Konstruksi. JURNAL OPTIMASI SISTEM INDUSTRI

- VOL. 18 NO. 1 (2019) 75-85

Yuda Ardiansyah, Dira Ernawati. (2024). Analisis Penerapan Suply Chain Management Pada Pengadaan Material Proyek Normalisasi Saluran Drainase Pasar Wadung Asri Sidoarjo. Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika Vol.2, No.1 Januari 2024 (224-233)

Rezav Habi Setyatama, Ulfi Pristiana. (2024). ANALISIS PENGARUH MANAJEMEN RANTAI PASOK PADA KETERLAMBATAN PEKERJAAN MEP (MECHANICAL, ELECTRICAL, PLUMBING) PADA PROYEK

APARTEMENT KYO SOCIETY SURABAYA. Neraca Manajemen, Ekonomi Vol 3 No 10 Tahun 2024

Refdizalis , Taufika Ophiyandri , Yervi Hesna. (2020). Studi Perilaku Rantai Pasok Konstruksi Pada Proyek Pembangunan Gedung. Jurnal Talenta Sipil, 3(2), Agustus 2020, pp.58-66

Gede Dharmana Dwi Santika, I Wayan Darya Suparta, Kt.Wiwin Andayani. (2023). ANALISIS KINERJA SUPPLY CHAIN MANAGEMENT TERHADAP EFISIENSI BIAYA DAN WAKTU PEKERJAAN STRUKTUR PROYEK SMPN

ABIANSEMAL. Seminar Nasional Ketekniksipilan ISSN 2985-3192 Jurusan Teknik Sipil – PNB Volume 2 Tahun 2023

Downloads

Published

2025-05-24